Copper Mountain Bridges

Summit County, Colorado: Design engineer of four, single span bridges with Mechanically Stabilized Earth (MSE) Abutments for the Copper Mountain expansion. Unique details for a covered bridge and rails required to meet the architectural design. Contact: Yenter Companies or BTE Concrete Form Works.

Details

Custom County and Residential Bridges

Western Colorado: Design engineer of over 25 custom bridges in steel, concrete and wood. Designs include custom rails, MSE abutments, suspension bridges and other state of art construction methods.

Details

dead-wood-bridge

Deadwood Bridge, Garfield County, Colorado

Design and Construction engineer of a custom 130′-0″ steel plate girder bridge with custom architectural heavy timber bridge rails and a corrugated bridge deck. Super structure and heavy bridge rail completed October 2013. Divide Creek Builders, Max Filiss, 970-618-7158

Details

Eighth Street Union Pacific Railroad Bridge

Glenwood Springs: Design engineer of an 80’-0” steel plate girder bridge with 28’ tall abutments for the City of Glenwood Springs, CO. Contact: Joe Kracum, Washington Infrastructure Services, (970) 928-8599.

Details

Keystone Ski Tip Bridges

Keystone, Colorado: Design engineer of three, single span bridges with Mechanically Stabilized Earth (MSE) Abutments for the Keystone Mountain expansion. Unique details for the bridge railing required to meet the architectural design. Contact: Bob Barrett, Yenter Companies, (303) 919-7419.

Details

Maroon Creek Pedestrian Bridge

Aspen, Colorado: Construction engineer for a 672 foot long, three (3) span cantilever pratt steel truss bridge. Provided a model of the entire bridge on STAAD-III computer software to determine maximum stresses during critical phases of construction. Contact: Joe Mueller, Civil Constructors, (970) 963-9755.

Details

oakmeadows

Oakmeadows Bridge, Garfield County, Colorado

Structural engineering and construction document for a 84′ long Integral Abutment bridge which replaced a deficient culvert. Provided QA/QC during construction May 2013 completion date. Jeff Nelson, Garfield County Colorado

Details

Ramp-E for I-25 to Colfax Viaduct

Denver: Design Engineer and construction support for a ramp from I-25 to Colfax Viaduct. This included roadway, high retaining walls, the widening of two existing cast-in-place concrete structures, and a cast-in-place post-tensioned, curved, box girder ramp structure. Project Cost: $4.3 Million. Contact: John Knopp, Project Manager, (303) 757-9269 or P.K. Padhiar (303) 757-9486.

Details

Roaring Fork Club Bridge

Basalt, Colorado: Design engineer for a 118’-0” single span, steel plate girder bridge with custom architectural bridge railings and rustic wood deck. Contact: Hans Brucker, (970) 927-1100.

Details

Shoshone

Shoshone Dam Interchange

Glenwood Canyon: Design Engineering for two (2) of the four (4) curved steel plate girder bridges consisting of one viaduct (12-130’ spans), one ramp structure (5-150’ spans), and two haunched bridges across the Colorado River (4-150’ to 325’ spans and 3-217’ to 274’ spans). Also on-site Construction Engineering for all four structures. Project Cost: $26…

Details

Snowmass Creek Suspension Bridge

Colorado: Design engineer of 150′ long suspension bridge with dead man on one end and a unique kneebrace assembly on the other end for wetland mitigation.

Details

WagonTrail Bridge

Garfield County, Colorado: Design engineer of an 150′-0″ steel plate girder bridge with custom architectural bridge rails and IPE bridge deck. Develope steel shop drawings for Big “R” Manufacturing. Contact: Shane Evans, Structural Assocoaites, (970) 945-0147.