Shoshone

Shoshone Dam Interchange

Glenwood Canyon: Design Engineering for two (2) of the four (4) curved steel plate girder bridges consisting of one viaduct (12-130’ spans), one ramp structure (5-150’ spans), and two haunched bridges across the Colorado River (4-150’ to 325’ spans and 3-217’ to 274’ spans). Also on-site Construction Engineering for all four structures. Project Cost: $26…

Copper Mountain Bridges

Summit County, Colorado: Design engineer of four, single span bridges with Mechanically Stabilized Earth (MSE) Abutments for the Copper Mountain expansion. Unique details for a covered bridge and rails required to meet the architectural design. Contact: Yenter Companies or BTE Concrete Form Works.

Ramp-E for I-25 to Colfax Viaduct

Denver: Design Engineer and construction support for a ramp from I-25 to Colfax Viaduct. This included roadway, high retaining walls, the widening of two existing cast-in-place concrete structures, and a cast-in-place post-tensioned, curved, box girder ramp structure. Project Cost: $4.3 Million. Contact: John Knopp, Project Manager, (303) 757-9269 or P.K. Padhiar (303) 757-9486.